Free punch list template

A punch list is the signed list of defects and unfinished work the owner and contractor agree to close out before a job is accepted. Bring it to the final walkthrough. Then download this construction punch list template free in Word or PDF, or fill it in and have both sides sign it online.

Free to use. Legally binding under the ESIGN Act, UETA, and eIDAS.Updated November 2026 by Document eSign
PUNCH LISTReady to sign online.SignatureSigned and datedSIGN
or download a copy
Overview

What this template is

A punch list is the last to-do list on a construction or renovation job. Near the end, the owner and the contractor walk the project together and write down everything that is not right yet: a scuffed door, a missing outlet cover, paint that stops short of the ceiling line, a cabinet that does not close. Each item gets a location, a description, the trade that has to fix it, and a date. Then the contractor works through the list, the owner checks each fix, and the job closes out. Simple idea. What turns it into a document worth signing is the agreement around the list. Who has to fix what, at whose cost, by when, and what happens to the money if items stay open? Without that, a punch list is a sheet of notes that both sides remember differently three weeks later. With it, both parties have a dated, signed record that ties the remaining work to the contract and makes final payment a matter of checking boxes instead of arguing. One boundary matters. A punch list covers work that was already in the contract and is not finished or not right. New work, or a change to what was agreed, belongs on a change order. This template says so in writing.

Who uses it

A homeowner closing out a kitchen remodel, addition, or new build before the final payment goes to the contractorA general contractor running the final walkthrough with a client and wanting a signed list so new requests do not creep inA property manager or landlord checking a unit turnover or tenant improvement before the space is handed backA small commercial owner accepting a fit-out, roof replacement, or parking lot job from a contractorA subcontractor working through items the general contractor assigned to its trade, who needs proof each one was signed offAn owner's representative or architect documenting open items before recommending release of retainage
What's inside
  • A project block tying the list to the address, the contract date, the contract or job number, and any approved change orders
  • A walkthrough record: date, who attended for each side, which areas were inspected, which were skipped, and whether photos were taken
  • A numbered item log with location, description, responsible trade, target date, and an owner verification column
  • A completion clause stating that listed items are fixed at no extra cost, by the dates shown, with site access hours
  • A clause that keeps scope changes off the list and sends them to a signed change order
  • A re-inspection procedure with a set number of days for the owner to check and initial each item
  • A payment option you pick: hold back a stated amount until the list closes, or leave payment entirely to the contract
  • A cure period and remedy if items are not finished, plus a clause that signing is not acceptance or a lien waiver
  • A final sign-off block for when every item is closed, and signature fields for the owner and the contractor
HOW IT WORKS

From template to signed in three steps.

01

Start from the template

Open it in the editor with the fields already mapped, or download the DOCX to edit offline.

02

Add signers and send

Drop signature and date fields, then route each party in order or in parallel.

03

Get a sealed copy

Everyone signs, and you get a tamper-evident PDF plus an audit certificate.

Start signing free

Free forever. No credit card. Your recipients sign with no account.

The details

Everything to know before you send it.

1

How to fill it in

Fill the project and walkthrough blocks before you start walking, then log items as you go. Use one row per defect. If a room has three problems, that is three items, not one line that says "fix bedroom".

  • Project block: copy the contract date and job number exactly. If change orders were approved, list their numbers so everyone knows which version of the scope you are checking against.
  • Walkthrough block: record who actually walked. If the architect or a key subcontractor was there, name them. Write down any area you did not inspect, such as an attic you could not reach, so nobody later claims it was approved.
  • Location: be specific enough that a trade who was not there can find it. "Unit 4B, hall bath, left of vanity" works. "Bathroom" does not.
  • Description: say what is wrong and what done looks like. "Grout missing at tub surround, bottom two rows, regrout to match" is an item someone can close.
  • Responsible trade: name the subcontractor or trade, such as drywall, electrical, or painting. The contractor owns the list, but this column is how the work gets assigned.
  • Target date: give each item its own date if timing varies, or leave the item blank and rely on the overall completion date in clause 4.
  • Clause 7: pick Option A or Option B and delete the other. Leaving both in is the single fastest way to start a payment dispute.
  • Sign it at the end of the walkthrough while both sides are standing there. Keep the final sign-off block blank until the last item is verified.
2

Where punch lists go wrong

Vague items cause most of the trouble. "Touch up paint throughout" can mean an afternoon or a week, and the owner and the painter will each pick the reading that suits them. Write items so a stranger could tell when they are done. Scope creep is the second problem. At the final walkthrough, owners often see the finished space for the first time and decide they want a different light fixture or one more shelf. Those are reasonable requests, but they are changes, not defects, and slipping them onto the punch list means the contractor is doing new work for free or the owner is surprised by a bill later. Clause 5 sends them to a change order. Third, people sign the punch list and then treat that signature as accepting the whole job. It is not. Clause 9 says plainly that signing the list is not acceptance, not a completion certificate, and not a release of lien rights or warranties. Last, an open-ended list never closes. Every item needs a date, and the re-inspection clause puts a number of days on the owner too, so the contractor is not left waiting weeks for a sign-off.

3

Punch list vs change order vs construction contract

These three documents do different jobs, and mixing them up is how small disagreements turn into withheld payments. The construction contract sets the original scope, price, schedule, warranty, and payment terms. A change order modifies that contract: it adds, removes, or alters work and adjusts the price or the schedule, and both sides sign it before the new work starts. A punch list changes nothing. It is a record of work the contract already required that is unfinished or not up to standard, plus an agreed plan to close it. If an item on your list would cost the contractor something that was never in the original scope, it does not belong on the list. If the contractor says an obvious defect is "extra", point to the contract and the drawings. Both tests come back to the same question: was this in the deal on day one? There is also a document at the far end. A certificate of completion records that the job, or a phase of it, is finished. On most jobs the punch list comes first and the completion certificate is signed once every item is closed. For the paperwork on either side of this one, our Subcontractor Agreement covers the trades doing the fixes, a Work Order handles one-off repair calls after handover, and the Certificate of Completion template records the finished job.

4

Retainage, final payment, and what the law says

Money is usually what makes a punch list matter. Many contracts let the owner hold back part of each payment, called retainage, until the job is finished, and the punch list is often what decides when that money is released. There is no single national rule for private jobs: retainage limits and release deadlines come from the contract and from state law, and they vary by state and by whether the project is public or private. Two published rules show how this works in practice. On federal construction contracts, FAR 52.232-5(e) caps retainage at 10 percent of a progress payment when satisfactory progress has not been made, and once the work is substantially complete the contracting officer may keep only what is adequate to protect the government and must release the rest. FAR 52.236-11(a) goes further: before the government takes possession of or uses any finished part of the work, the contracting officer has to give the contractor a list of items remaining to be performed or corrected, which is a punch list by another name. In Washington, RCW 60.28.011 caps retainage on public improvement contracts at five percent of the money the contractor has earned, and anyone who supplied labor or materials must give notice of a claim against that retainage within 45 days of completion of the contract work. Private residential jobs in most states run on whatever the contract says, so read your payment clause before choosing Option A in clause 7. Sources: FAR 52.232-5, FAR 52.236-11, and FAR 32.103 (acquisition.gov); RCW 60.28.011 (app.leg.wa.gov).

5

A filled-in example

Here is part of a real-looking list for a kitchen and bath remodel at 418 Alder Lane, built under a contract dated 3 February 2026 with Change Orders 1 and 2 approved. Owner Rachel Pruitt walked the house with site lead Tom Becker of Becker Home Builders on 6 May 2026, from 9:00 to 11:30, and they logged 14 items. Every name and number here is invented.

  • Item 1. Location: kitchen, island, sink side. Description: lower cabinet door rubs frame and does not close fully, adjust hinges or replace door. Responsible: cabinets (Northline Millwork). Target date: 12 May. Verified complete: 11 May, RP.
  • Item 2. Location: primary bath, ceiling above shower. Description: visible drywall seam and nail pops, retape, sand, prime, and repaint to match. Responsible: drywall, then painting. Target date: 15 May. Verified complete: blank, owner rejected on 15 May because the seam still shows in daylight, contractor notified in writing.
  • Item 3. Location: exterior, rear deck stair. Description: handrail bracket loose at bottom post, secure with structural screws per plans. Responsible: framing. Target date: 10 May. Verified complete: 10 May, RP.
  • Item 4. Location: laundry room, dryer wall. Description: dryer vent not connected to the exterior hood, connect with rigid metal duct per the dryer manufacturer's instructions. Responsible: HVAC (Coastal Air Mechanical). Target date: 9 May. Verified complete: 9 May, RP.
  • In this example the owner chose Option A in clause 7 and held back 2,500 dollars against the 14-item list. The money was paid within 10 days of the last item being initialed, exactly as the clause set out.
6

Running the walkthrough

Book the walkthrough when the contractor says the job is essentially done, not while trades are still on site. Half-finished rooms make for a useless list. Walk in daylight if you can, because paint flaws and uneven drywall show up in raking light and disappear under overhead bulbs. Go room by room in a fixed order and photograph each item, writing the photo number next to it on the list. If the architect or designer is involved, have them on the walk, since they know what the drawings called for. Contractors benefit from doing their own pre-punch walk 3 or 4 days earlier. Fixing the obvious items before the owner sees them shortens the official list and makes close-out faster for everyone.

  • Electrical: try every switch and outlet, press the test button on each GFCI receptacle, and confirm the breakers in the panel are labeled.
  • Plumbing: run each faucet hot and cold for 30 seconds, flush every toilet, and look under each sink for drips.
  • Doors and windows: open, close, and lock every one. Note any that stick, rub, or need a second push to latch.
  • Finishes: hold a flashlight flat against walls and trim. Paint misses, uneven drywall, and gaps in caulk show up immediately.
  • Mechanical: run the HVAC on heat and on cool, and check that air moves at every register.
7

Signing, records, and when to get advice

A punch list is an ordinary agreement between the owner and the contractor, so it needs no notary or witness, and both parties can sign it electronically. Under the federal ESIGN Act, 15 U.S.C. 7001(a), a signature, contract, or other record relating to a transaction in or affecting interstate commerce may not be denied legal effect solely because it is in electronic form. Send the signed copy to both sides, keep the photos with it, and file the final sign-off with the contract and the change orders. This page is general information, not legal advice. Talk to a construction attorney before you withhold a large payment, if the contractor disputes whether items are defects or extras, or if a lien deadline is close, because those deadlines are set by state law and missing one can cost real money.

Disclaimer

This template and the guidance on this page are provided for general information only and are not legal advice. Laws differ by country and state, so review the final document against your own situation and have a qualified lawyer check anything high-value or regulated before you sign.

FAQ

Questions, answered.

What is a punch list in construction?

It is the list of unfinished or defective work found near the end of a job, usually at a walkthrough with the owner. Each item names the location, the problem, who fixes it, and a target date. The contractor closes the items and the owner verifies them before the job is accepted and final payment is made.

Who creates the punch list, the owner or the contractor?

Usually both. The contractor often does a pre-punch walk first, then the owner, architect, or owner's representative walks the job with the contractor and adds items. The final version should be signed by both sides so neither can later say an item was never agreed.

Can a contractor refuse a punch list item?

A contractor can dispute an item that is outside the contract, such as a new request or damage the owner caused after the walkthrough. Those go on a change order or are handled separately. Work the contract already required that is unfinished or defective is the contractor's to fix at no extra cost.

Can I withhold payment until the punch list is done?

Only as far as your contract and state law allow. Many contracts permit retainage or a holdback tied to open items. Keep the amount reasonable for the work left, state it in writing, and check your state's retainage and prompt-payment rules before holding back a large sum.

What is the difference between a punch list and substantial completion?

Substantial completion is the point where the work is far enough along to be used for its purpose, and contracts often attach payment or warranty dates to it. The punch list is the set of remaining items still open at that point. Signing the punch list does not by itself certify completion.

How long should punch list work take?

Check your contract first, since it may set a close-out period. If it does not, the dates are yours to agree. For small cosmetic fixes, a week or two is a sensible target to write in. Allow longer for anything waiting on special-order parts. Give each item a date and put a re-inspection deadline on the owner too.

Is the punch list template available in Word format?

Yes. Download the punch list as a Word (.docx) file and edit it in Microsoft Word, Google Docs, or Pages. Add rows for as many items as your walkthrough turns up. You can also download a PDF or fill it in and sign online.

Can I download the punch list as a PDF?

Yes. A print-ready PDF is available alongside the Word version, which is handy for carrying on a clipboard during the walkthrough. Download either one free, or fill it in and sign online without downloading anything.

Live in under a minute

Ready to send your first envelope?

Create your free forever account, upload a document, and send it for signature in minutes. No credit card required.

30 free envelopes a month Legally binding · global Audit trail on every document